Lead paragraph
Target Indicators: (1) One RNG boiler (37 MW) installed by 2026, and a second installed by 2034. (2) One CHP unit (9.6 MW thermal, 10.5 MW electricity output) installed by 2034. (3) One CHP unit (6.4 MW thermal, 7 MW electricity output) installed by 2042.
Responsible party: TBD